HOME  »  Photos » Photos » Renovation project of a Wega Airy EVD.1 - April 20...  (42 Slides)     [Page 3 of 3] :: Jump To  
  First page Previous page      Up one level      You have reached the last page You have reached the last page  
IMG_0921 * 3648 x 2736 * (5.13MB)
IMG_0922 * Stripping the machine. * 3648 x 2736 * (3.85MB)
IMG_0923 * Inside of the boiler. * 3648 x 2736 * (3.51MB)
IMG_0924 * Boiler endplate. * 3648 x 2736 * (5.86MB)
IMG_0925 * Piping of the waterlevel looking glass. * 2736 x 3648 * (3.73MB)
   
  Stripping the machine.  
  Inside of the boiler.  
  Boiler endplate.  
  Piping of the waterlevel looking glass.  
IMG_0926 * Manual water fill. * 3648 x 2736 * (5.66MB)
IMG_0927 * The frame. * 2736 x 3648 * (5.37MB)
IMG_0928 * Boiler after descaling. * 3648 x 2736 * (4.18MB)
IMG_0929 * Boiler after descaling. * 3648 x 2736 * (4.49MB)
IMG_0930 * Boiler after descaling. * 3648 x 2736 * (4.73MB)
  Manual water fill.  
  The frame.  
  Boiler after descaling.  
  Boiler after descaling.  
  Boiler after descaling.  
IMG_0931 * Heating element; there is some koper underneath the black... * 3648 x 2736 * (3.57MB)
IMG_0932 * The boiler. * 3648 x 2736 * (4.08MB)
  Heating element; there is some koper underneath the black...  
  The boiler.  
Album last updated on 26-03-2012
J. de Meijer ©