HOME  »  Photos » Photos » Creating my new espresso bar - March till May 2010  (22 Slides)     [Page 2 of 2] :: Jump To  
  First page Previous page      Up one level      You have reached the last page You have reached the last page  
IMG_0108 * Plumbing rerouted and old convector removed. * 1200 x 1600 * (533KB)
IMG_0109 * Machines temporarily connected. * 1600 x 1200 * (539KB)
IMG_0110 * Machines temporarily connected. * 1200 x 1600 * (495KB)
IMG_0111 * Closed the floor again. * 1200 x 1600 * (516KB)
IMG_0112 * Closed the floor again. * 1200 x 1600 * (554KB)
  Plumbing rerouted and old convector removed.  
  Machines temporarily connected.  
  Machines temporarily connected.  
  Closed the floor again.  
  Closed the floor again.  
IMG_0113 * Everything neat and tidy. * 1200 x 1600 * (583KB)
IMG_0116 * With the new cupboard installed. * 1600 x 1200 * (606KB)
  Everything neat and tidy.  
  With the new cupboard installed.  
Album last updated on 26-03-2012
J. de Meijer ©